Much like every site on the internet, we use cookies to help analyze traffic and improve our website. As outlined in our privacy policy, any information is only used internally and is not shared with outside organizations.
Learn More

How you manage your QuickTest® Pro test assets will have a significant impact on the success of your project.  We put together a white paper that discusses project management using either QC/ALM or the standard Windows® file system.  We also go on to show you how Test Design Studio builds on these techniques to provide a superior experience.

These techniques are valuable to anyone working with QuickTest® Pro, and not just Test Design Studio customers.  We hope you enjoy the white paper and will share with your colleagues.

The white paper can be downloaded here.

The next release of Test Design Studio 2.0 will include a new feature to perform file locking in Quality Center / ALM.  When you open a test, attachment, resource, or BPT component for editing, Test Design Studio will attempt to acquire a lock on that file.  If the file is already locked by another user (either through Test Design Studio or tools like QuickTest), you will be notified that the file is locked.  At that time, the file will open in read-only mode.

This new feature should help teams collaborate without impacting the work of someone else.  If you prefer to disable the locking feature, you may do so using Test Design Studio options.  Select ‘Tools –> Options’ from the main menu, then expand the path for ‘HP –> Quality Center’.  Here you will find the option to enable/disable file locking.

We hope you enjoy this new feature coming in build 2.0.4571.

[Update] The new release of Test Design Studio 2.0.4572 is now available and includes this new feature.